Promote your equipment - it's free!
300 PAX AWB - HEAVY LIFT WORKBARGE FOR CHARTER
PIPE-LAYING HEAVY LIFT WORKBARGE FOR CHARTER.
  • Year built: 2012
  • 300 PAX accommodation.
  • Classification/Notation: ABS, Maltese Cross + A1 Barge + with descriptive notation TBA Unrestricted services.

Designed for the following offshore activities:

  • Accommodation platform
  • Pipe laying activities
  • Offshore construction and hook-up support
  • Shallow draft operations

Flag: Marshall Islands

Price on request

Principal Dimensions and Characteristics
Length Over All: 113.83 m 373 feet
Beam: 31.70 m 104 feet
Depth (Scantling): 7.30 m 24 feet
Depth (Normal pipe laying Operating): 3.80 m 12 feet
GRT/NRT: 12,641/3,792
Capacities:
Fresh Water (includes DB tanks): 1,090 cubic meters 1,426 cubic yards
Fresh Water (excludes DB tanks): 1,200 cubic meters 1,570 cubic yards
Fresh Water Makers: 2 x 100 tons RO type
Sea Water: 11,800 cubic meters 15,434 cubic yards
Fuel Oil: 1,630 cubic meters 2,132 cubic yards
Clear Deck Space: Open 2,100 m2 abt + Sheltered 410 m2
Deck Strength: 15 t/m2
Year Built: Early 2012
Classification Society: ABS (American Bureau of Shipping)
Class Notation: Maltese Cross + A1 Barge + with descriptive notation TBA
Unrestricted services.
Accommodation:
300 men comprising (310 beds)
31 x 4 berth cabins— deck 3
22 x 4 berth cabins— deck 4
15 x 4 berth cabins— deck 5
14 x 2 berth cabins— deck 5
8 x 1 berth cabins— deck 5
2 x 1 berth cabins— deck 6
1x hospital/1x client Eng. Office/1 x client insp. Office
11 further offices/1 x crew cinema/1 x client cinema
2 x conference rooms/ helicopter reception room
Auxiliary Equipment
7 x independently driven generating sets comprising:
Make/Model: 5 x CAT
Power: 590 kW x 5 791 hp x 5
Make/Model: 2 x CAT
Power: 850 kW x 2 1,140 hp x 2
Power: 150 kW x 1 201 hp x 1
Total: 4,800 kW 6,437 hp
8-Point Mooring System
Winches: 8 x fast-operating all electric winches
Capacity (diameter): 1,500 m of 6 mm 4,921 feet of 0.24 inches
Anchors: 8 x Flipper Delta, 10 tons
Line Pull: 90 tons
Deck Pedestal Crane
Make/Model: American / 11750
Type: Kingpost/pedestal
Main Hook: 228 tons
Boom Length: 21.3 m & 45.7 m 70 feet & 150 feet
To be upgraded to 600M/T lift 4th qtr. 2012
Deck Mobile: As Required
Pipe Lay Equipment
2 x 60 t pipe tensioners
4 inch (102 mm) up to 52 inch (1,321 mm) OD pipe
1 x A&R winch
Helideck
Certified for Sikorski S61 in accordance with MODU regulations.
Safety / Lifesaving Equipment
Vessel built to SPS2008 and MODU codes
4 x 150 Pax Lifeboats (2 x port, 2 x stbd)
+ Life rafts
All details on these pages are given in good faith and are believed to be accurate but no warranty of accuracy or completeness or suitability for purpose is either stated or implied. Prices are subject to change without notice.

 

Images

https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-3.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-4.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-67.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-charter.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-5.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-6.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-7.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-8.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-9.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-10.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-11.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-12.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-13.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-15.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-16.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-17.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-18.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-19.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-20.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-21.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-29.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-30.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-31.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-32.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-33.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-34.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-35.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-36.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-37.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-38.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-39.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-40.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-41.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-42.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-43.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-44.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-45.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-46.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-47.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-48.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-49.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-50.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-51.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-52.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-53.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-54.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-55.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-56.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-57.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-58.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-59.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-60.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-61.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-62.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-64.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-65.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-charter-1.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-charter-67.jpg

 

Equipment details believed correct but not garanteed.

All equipment is offered subject to prior sales.

Basic terms of sale is that the equipment is to be sold as seen, no warranty provision.
Transfer of Ownership on receipt of full payment.

Please advise if interested and we will organise an on-site inspection of the equipment offered.

Enquire for this equipment

    Your Name (required)

    Your Email (required)

    Your Message

    Please type the characters you see in the picture

    captcha

    I agree with this website storing my information as written in the Privacy Policy

    I agree (required)

    Equipment details believed correct but not garanteed.

    Availability is offered subject to prior sales without notice.

    Equipment offered is to be sold as seen, no warranty implied or provided.
    Transfer of Ownership on receipt of full payment.

    Please advise whether the equipment offered is of any further interest and we will organize for an inspection on-site.

     

    Categories: Keep off frontpage