Promote your equipment - it's free!
120 PAX ACCOMMODATION MODULE FOR SALE OR CHARTER / LIVING QUARTERS LIVING QUARTERS / ACCOMMODATION MODULE FOR SALE OR CHARTER Y.O.M. 2012 UNUSED DNV CERTIFIED DESIGNED AND BUILT FOR NORTH SEA 120 PAX 60 OFF TWO-MAN CABINS 2 OFF SINGLE-MAN CABINS (CAN BE CONVERTED) GALLEY MESS FACILITIES WITH SEATING FOR 48 PEOPLE LAUNDRY FACILITIES OFFICE SUITE EMERGENCY COMMAND AND CONTROL AREAS RECREATIONAL AREAS PLANT AREA ALUMINIUM HELIDECK COMPLYING WITH CAP437 (6TH EDITION) NEW HVAC SYSTEM AND PORTABLE WATER SYSTEM The Living Quarters is a 5-level accommodation block with an additional art level on the roof containing the operational plant. External deck areas on Level 1 are provided for Galley Laydown on the east side of the Lifeboat Embarkation on the north side. Levels 1 and 2 of the Living Quarters are work orientated areas, and include locker and toilet facilities, messing, offices and recreation. This arrangement segregates the noisy operations from the quiet levels above. Levels 3 and 4 are Cabin areas and Level 5 is Cabins, Transit and Medical Facilities. The Living Quarters as a whole is classified as the Temporary Refuge, with two dedicated Muster Areas in the Level 1 Male Change and Dining Room. Controlled evacuation from the Muster Areas is then to the Lifeboat Embarkation Areas external. PRICE AND FURTHER DETAILS UPON REQUEST  

Images

https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL_1.1.1-1024x725.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL_1.1-863x1024.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL_1.2.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL_7.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL_6-1024x329.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL_5-1024x290.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL_4-1024x490.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL_3.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/07/120-PAX-ACCOMMODATION-MODULE-FOR-SALE-OR-RENTAL_2.jpg

 

Equipment details believed correct but not garanteed.

All equipment is offered subject to prior sales.

Basic terms of sale is that the equipment is to be sold as seen, no warranty provision.
Transfer of Ownership on receipt of full payment.

Please advise if interested and we will organise an on-site inspection of the equipment offered.

PIPE-LAYING HEAVY LIFT WORKBARGE FOR CHARTER. Year built: 2012 300 PAX accommodation. Classification/Notation: ABS, Maltese Cross + A1 Barge + with descriptive notation TBA Unrestricted services. Designed for the following offshore activities: Accommodation platform Pipe laying activities Offshore construction and hook-up support Shallow draft operations Flag: Marshall Islands Price on request Principal Dimensions and Characteristics Length Over All: 113.83 m 373 feet Beam: 31.70 m 104 feet Depth (Scantling): 7.30 m 24 feet Depth (Normal pipe laying Operating): 3.80 m 12 feet GRT/NRT: 12,641/3,792 Capacities: Fresh Water (includes DB tanks): 1,090 cubic meters 1,426 cubic yards Fresh Water (excludes DB tanks): 1,200 cubic meters 1,570 cubic yards Fresh Water Makers: 2 x 100 tons RO type Sea Water: 11,800 cubic meters 15,434 cubic yards Fuel Oil: 1,630 cubic meters 2,132 cubic yards Clear Deck Space: Open 2,100 m2 abt + Sheltered 410 m2 Deck Strength: 15 t/m2 Year Built: Early 2012 Classification Society: ABS (American Bureau of Shipping) Class Notation: Maltese Cross + A1 Barge + with descriptive notation TBA Unrestricted services. Accommodation: 300 men comprising (310 beds) 31 x 4 berth cabins— deck 3 22 x 4 berth cabins— deck 4 15 x 4 berth cabins— deck 5 14 x 2 berth cabins— deck 5 8 x 1 berth cabins— deck 5 2 x 1 berth cabins— deck 6 1x hospital/1x client Eng. Office/1 x client insp. Office 11 further offices/1 x crew cinema/1 x client cinema 2 x conference rooms/ helicopter reception room Auxiliary Equipment 7 x independently driven generating sets comprising: Make/Model: 5 x CAT Power: 590 kW x 5 791 hp x 5 Make/Model: 2 x CAT Power: 850 kW x 2 1,140 hp x 2 Power: 150 kW x 1 201 hp x 1 Total: 4,800 kW 6,437 hp 8-Point Mooring System Winches: 8 x fast-operating all electric winches Capacity (diameter): 1,500 m of 6 mm 4,921 feet of 0.24 inches Anchors: 8 x Flipper Delta, 10 tons Line Pull: 90 tons Deck Pedestal Crane Make/Model: American / 11750 Type: Kingpost/pedestal Main Hook: 228 tons Boom Length: 21.3 m & 45.7 m 70 feet & 150 feet To be upgraded to 600M/T lift 4th qtr. 2012 Deck Mobile: As Required Pipe Lay Equipment 2 x 60 t pipe tensioners 4 inch (102 mm) up to 52 inch (1,321 mm) OD pipe 1 x A&R winch Helideck Certified for Sikorski S61 in accordance with MODU regulations. Safety / Lifesaving Equipment Vessel built to SPS2008 and MODU codes 4 x 150 Pax Lifeboats (2 x port, 2 x stbd) + Life rafts All details on these pages are given in good faith and are believed to be accurate but no warranty of accuracy or completeness or suitability for purpose is either stated or implied. Prices are subject to change without notice.  

Images

https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-3.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-4.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-67.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-charter.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-5.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-6.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-7.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-8.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-9.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-10.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-11.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-12.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-13.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-15.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-16.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-17.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-18.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-19.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-20.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-21.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-29.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-30.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-31.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-32.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-33.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-34.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-35.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-36.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-37.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-38.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-39.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-40.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-41.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-42.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-43.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-44.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-45.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-46.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-47.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-48.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-49.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-50.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-51.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-52.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-53.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-54.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-55.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-56.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-57.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-58.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-59.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-60.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-61.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-62.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-64.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-chart-65.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-charter-1.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/300-PAX-AWB-pipe-laying-heavy-lift-work-barge-available-for-charter-67.jpg

 

Equipment details believed correct but not garanteed.

All equipment is offered subject to prior sales.

Basic terms of sale is that the equipment is to be sold as seen, no warranty provision.
Transfer of Ownership on receipt of full payment.

Please advise if interested and we will organise an on-site inspection of the equipment offered.

DP-3 ACCOMMODATION VESSEL FOR SALE PRINCIPAL PARTICULARS
Year Built: May 2015
Builder: Fujian Mawei
Class: ABS +A1 Mobile Offshore Unit, +AMS (E) DPS-3 UWILD, Helideck
Flag: Marshall Islands

DIMENSIONS
Length Overall (Elevated Hull) : 84.00m
Length Overall ( Submerged Hull) : 81.00m
Beam Molded : 32.00m
Depth to Main Deck : 22.20m
Depth to top of Heli Deck Reception : 39.70m
Lightship Draft : 5.80m
Operating Draft : 8.90m
Deep Operating Draft : 14.60m

MACHINERY
Main Diesel Generators: 6 x 2800 Kw (total 16800Kw) RR Bergan
Emergency Generator : 1 x 1825 Kw
Shore Power : 1 x 400A Shore Supply Receptabal
                          4 x 3000Kw 360 deg Azimuths
Thrusters : 4 x 3000Kw 360 deg Azimuths
                           Rolls Royce US 305P40

SPEED
Speed at 8.20m Draft : 10.5 Knots.
Type of Fuel : Marine Gas Oil
Fuel Consumption : 25mt day cruising @ 85% on 2 thrusters
                                     18-20mt day on 24 hr DP 4 thrusters @ 50%

ACCOMMODATION
Passengers: 1 x 1 man. 181 x 2 man. = 363 passengers
Crew : 6 x 1man. 31 x 2man=68 Crew and Catering
TOTAL POB : 431

DECK CRANE
Macgregor KBC : 60t @ 25m – 20t @ 45m
Aux Winch : 10t @ 50m Man Riding 3t @ 50m

HELIDECK
To suit Sikorsky S91-N or Super Puma, (Complies with CAP 437)

DP System
Kongsberg C Pos DPS-3, with following reference systems:
3 x Gyro Compass - 3 x Wind sensors - 3 x VRUs - 2 x DGPS
1 x Fan Beam 1 x Radius - 1 x HIPAP 350

PRICE ON REQUEST

Images

https://www.offshore-crane.com/wp-content/uploads/2016/02/400-PAX-DP-3-VESSEL_2-1-1024x507.jpg

 

Equipment details believed correct but not garanteed.

All equipment is offered subject to prior sales.

Basic terms of sale is that the equipment is to be sold as seen, no warranty provision.
Transfer of Ownership on receipt of full payment.

Please advise if interested and we will organise an on-site inspection of the equipment offered.

CRANE BARGE FOR CHARTER SHEERLEG CRANE MAX. SWL: 400 TON IMMEDIATELY AVAILABLE YEAR BUILT: 1976 YEAR RE-BUILT: 2003 FLAG: INDIA CLASS: SU, 'PONTOON' I.R.S. LENGTH OVERALL: 40.60 M LENGTH BP: 39.3 M BEAM MOULDED: 20.20 M DEPTH MOULDED: 3.60 M GROSS TONNAGE: 817 NET TONNAGE: 245 CRANE: SWL SINGLE HOOK: 225 MT SWL DOUBLE HOOK: 2 X 200 MT GENERATORS: 62.5 KVA x 1 (HARBOUR) 450 KVA x 1 (VESSEL OPERATION)   AVAILABLE: CRANE BARGE FOR CHARTER PRICE ON REQUEST

Images

https://www.offshore-crane.com/wp-content/uploads/2016/02/450-ton-sheerleg-for-charter-1024x711.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/450-ton-sheerleg-for-charter_1-1024x792.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/450-ton-sheerleg-for-charter_GA-drawing-1024x575.jpg
https://www.offshore-crane.com/wp-content/uploads/2016/02/450-ton-sheerleg-for-charter_loadchart.jpg

 

Equipment details believed correct but not garanteed.

All equipment is offered subject to prior sales.

Basic terms of sale is that the equipment is to be sold as seen, no warranty provision.
Transfer of Ownership on receipt of full payment.

Please advise if interested and we will organise an on-site inspection of the equipment offered.